MediumWater Utilities

Water pressure problems across Peekskill

Multiple residents said they get as little as 20 PSI at home and asked that water pressure be studied before more development. The engineer noted the Frost Lane project's new looping main should actually improve local pressure.

2 mentions (2 this month)Last discussed Oct 15, 2026
HighWater Utilities

Water and sewer system needs

The water department's budget covers dam rehab, old chemical tanks, aging sewer pipes, hydrant replacements and the lead service line inventory. Staff wants one new maintenance worker to tackle cracked pipes proactively instead of waiting for sinkholes.

1 mention (1 this month)Last discussed Oct 5, 2026
HighWater Utilities

Lockwood Drive culvert replacement and stormwater grants

The long-delayed stormwater culvert repair under Lockwood Drive finally has funding lined up — state resiliency, county flood mitigation, and CDBG money — with engineering design starting now and construction hoped for 2026–2027.

3 mentionsLast discussed Sep 28, 2026
MediumWater Utilities

Long-term maintenance of stormwater projects

Residents pressed on who pays to maintain new green infrastructure after grant funds run out. Engineers said maintenance is designed to be light (gardening-level), a maintenance guide comes with each project, and street sweeping is the one fundable upkeep item.

2 mentionsLast discussed Sep 24, 2026
HighWater Utilities

$5 Million Flood Mitigation Grant Application

The city commissioned three federally funded flood studies after years of property damage and street flooding. Engineers modeled 1-, 10-, and 100-year storms (with a 20% future rainfall bump) and proposed culvert upsizings, pond retrofits, and channel lowering. Final reports land in October and December.

2 mentionsLast discussed Sep 24, 2026
MediumWater Utilities

Reservoir water system resiliency upgrades

The solar project review surfaced needed upgrades to the city's aging reservoir infrastructure — inoperable valves, a fragile 70-year-old pipeline, and no real backup storage. Some improvements would benefit the city even without the solar project, raising the question of who pays.

1 mentionLast discussed Aug 11, 2026
HighWater Utilities

T-Mobile equipment relocation from water tower

The city has to pay $132,068.11 to move T-Mobile's equipment off the century-old water tower on Benefield Boulevard because the lease never required the carrier to pay for its own removal. Councilmembers were frustrated by the lopsided lease terms.

1 mentionLast discussed Aug 10, 2026
HighWater Utilities

Lower South Street Sewer Improvements

The sewer main reroute through the riverfront frees up Water Street properties for future development and gets the project shovel-ready for state grant money — but the price tag has grown from $4.1 million to $11.4 million.

4 mentionsLast discussed Jul 27, 2026
HighWater Utilities

Water infrastructure improvement bidding (EFC Grant #19091)

A $3 million state grant will fund replacement of four-inch water mains and the 1922 drinking water storage tank. The city wants authorization to put both projects out to bid while the season allows.

2 mentionsLast discussed Jun 8, 2026
MediumWater Utilities

Sewer System Inflow and Infiltration Study

Rainwater is getting into the sewer pipes, making pump stations run long after storms. A state planning grant would study the problem and unlock future repair funding.

3 mentionsLast discussed May 11, 2026
HighWater Utilities

Wiccopee Dams Engineering Assessment

State rules require a professional engineer to assess the Upper and Lower Wiccopee Dams every ten years; the council started the RFP process to hire one.

4 mentionsLast discussed May 11, 2026
MediumWater Utilities

Hollowbrook Dam Intake Structure Repairs

State DEC requires a certified engineer's assessment of the city dam every ten years. Barton & Loguidice won the bid at $38,500 — $54,500 below Labella.

2 mentionsLast discussed May 4, 2026
LowWater Utilities

Backflow prevention program maintenance

A proposal to maintain the city's backflow and cross-connection program, which keeps contaminants out of the drinking water supply.

1 mentionLast discussed Apr 6, 2026
MediumWater Utilities

Westchester Power Energy Supply Agreement (CCA)

The statewide CCA electricity program is ending. Power stays on via Con Edison; residents can pick another energy supplier if they want.